Agent
PROPOSESDrafts a PFMEA line from the process flow and the characteristic. It does not rate it.
Agentic quality engineering for manufacturing
The agentic platform for automotive quality engineering. From the customer drawing to the part submission warrant, MIYOQA keeps your quality records connected, calculates figures with engines, and leaves decisions to your engineers.
Agents proposeEngines computePeople decide
Example data · Part 72-3140, fuel pump housing
The problem
The PFMEA, the control plan and the inspection results are kept in separate documents. A change to one is not reflected in the others, and the gap is found later, at audit or at the customer.
A design change reaches the drawing, but not the PFMEA.
A corrective action closes, but the control plan does not change.
The same audit finding returns at the next audit.
How work is done
Each step is recorded with the person, agent or engine that performed it.
Drafts a PFMEA line from the process flow and the characteristic. It does not rate it.
Calculates the action priority from the ratings the engineer entered.
Rates severity, occurrence and detection, reviews the calculation and approves the revision.
A proposal becomes a record only where that record is kept, and only when a person accepts it.
Explore MIYOQA
One identity for each part, characteristic, operation and lot, shared by more than 30 work surfaces.
Learn more IntelligenceIt names records, runs the engines and drafts the work. People rate, approve and release.
Learn more EnginesSPC, capability, MSA, risk, geometry and line balance, each result kept with its inputs.
Learn more LifecycleEach part moves from sourcing to closure, with the required records at every gate.
Learn more TrustIsolation, a tamper-evident audit trail, signatures, separation of duties and export control.
Learn moreMeasured performance
Runs correct on the twelve hardest investigation tasks on the Engineering Board: fishbone, 5-Why, Is/Is-not, A3 and others.
Three runs per task · Sonnet 5.5 · 7 October 2026 · on the release now in production
8D problem-solving runs correct, from containment to the verified corrective action.
Three runs per task · Sonnet 5.5 · 6 October 2026
Internal benchmarks. Method available on request.
Demonstration
Provide one part's BOM, PFMEA and control plan. We will show what is connected and what is missing.
Contact
contact@miyoqa.comComplete the request form, or write to us with your name, company and the part you would like to review. We reply within two working days.